Sign In | Join Free | My burrillandco.com
Home > Wheel Loader Machine >

Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader

Chanchiyo Holdings Group
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader from wholesalers
     
    Buy cheap Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader from wholesalers
    • Buy cheap Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader from wholesalers
    • Buy cheap Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader from wholesalers
    • Buy cheap Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader from wholesalers

    Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader

    Ask Lasest Price
    Brand Name : MCLLROY
    Model Number : MSL932
    Certification : CE/ISO
    Price : $4000-8000/
    Payment Terms : 30% T / T in advance and 70% balance before shipment / 100% L / C at sight
    Supply Ability : 100 Units / Month
    Delivery Time : 5-8 days
    • Product Details
    • Company Profile

    Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader

    Operating Load 1500kg Front End Wheel Loader,Small Hub Axle Wheel Shovel Loader


    1. Products Description of MCLLROY Wheel Loader

    If you're looking for a small machine with bigger performances,then MCLLROY wheel loader is made for you with its amazing lifting and dumping height and huge breakout force when it is equipped with buckets,or with pallet forks,guaranteed max productivity.


    We use Yunnei engine for this loader. Many developing countries do not currently have strict requirements on engine emissions. Therefore, for export to Southeast Asia, we use Yunnei engines. Yunnei engines are relatively stable in performance and affordable, and can be described as the most cost-effective engine among small loaders.


    2. Specification of MCLLROY Wheel Loader

    MSL932/ZL932Metric Units
    Engine ModelChangfa 490 Supercharged /Yun Nei 490 Supercharged
    RPM2400
    Rated Power60 kW
    EmissionsEU Stage II
    Operating Weight3900 kg
    Load Capacities1500-2000 kg
    Bucket Capacities1.0 m³
    Max. Travel Speed38 km/h
    Gear BoxCVT
    265 torque converter
    AxleSmall hub reductro
    Axle Base2400 mm
    BrakeAir Brake
    Hydraulic Cycle time - lift≤ 8 s
    Min. Ground Clearance280 mm
    Wheel Base1800 mm
    Reach at Max.Dump Height3300 mm
    Dump Reach750 mm
    Overall Length - With Bucket5840 mm
    Overall Width1900 mm
    Overall Height2820 mm


    3.Details and advantages of MCLLROY Wheel Loader

    The enhanced front and rear frames are proved by 100,000-cycle reliability test.

    The lower hinge joint is upgraded from knuckle bearings to tapered roller bearings to prolong the life by 50%.

    The wheelbase of the rear frame is extended to enhance the stability and tipping load of the whole machine.

    New designed axle with thicker shell.

    Oil tube is connected in priority valve in non-rotated form,which prevents the oil tube from cracking in cold circumstances.

    The high tenacity engine hood creates a safer and bigger space of maintenance.

    Three-layer steel wire tube makes long service life.

    Double air filter to prolong the service life of the engine.

    All the pin and bush are made of the top steel grades in steel production :Bearing Steel.


    4.Production lines of MCLLROY Wheel Loader

    A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection


    Spray painting:

    Normally, the spray painting process includes hanging the parts, spraying primer or first layer coating, baking finish, spraying second layer coating, baking finish, drying in three different temperature.

    The workers in charge of hanging will check if the part has dust and oil, anything that will affect painting, which will be removed.

    There are two worker at Station 1 to do the painting on one side of the part.

    Another 2 workers at Station 2 will paint the other side, and the third worker will check if there is any spot missing and repaint.

    Next is our baking room and No. 1 to No. 3 drying machines.

    Pick up station workers use forklift to transfer the finished parts to the part's corresponding storage place, which is usually next to the production line.

    Some factories only hire one person to take care of the spray painting to cut the cost. It is hard to control the painting quality like that.

    Our technicians in the painting process are supposed to control the painting flow rate just right, without over painting, and the thickness of each surface should be balanced. In the pick up Station, there are special personnel for quality inspection of painted parts. Similarly, our factory adopts report mechanism. Subsequent assembly or factory inspection inspector find that the spray painting is unqualified and they will report it.


    Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader


    Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader


    Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader


    WZQ Issued


    Quality Operating Load 1500kg Front End Wheel Loader Small Hub Axle Wheel Shovel Loader for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Chanchiyo Holdings Group
    *Subject:
    *Message:
    Characters Remaining: (0/3000)