Sign In | Join Free | My burrillandco.com
Home > 2.5 Ton Wheel Loader >

Industrial Wheel Loader Mining , Sand Loader Machine With 1.2m3 Bucket Capacity

Chanchiyo Holdings Group
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Industrial Wheel Loader Mining , Sand Loader Machine With 1.2m3 Bucket Capacity from wholesalers
     
    Buy cheap Industrial Wheel Loader Mining , Sand Loader Machine With 1.2m3 Bucket Capacity from wholesalers
    • Buy cheap Industrial Wheel Loader Mining , Sand Loader Machine With 1.2m3 Bucket Capacity from wholesalers
    • Buy cheap Industrial Wheel Loader Mining , Sand Loader Machine With 1.2m3 Bucket Capacity from wholesalers
    • Buy cheap Industrial Wheel Loader Mining , Sand Loader Machine With 1.2m3 Bucket Capacity from wholesalers

    Industrial Wheel Loader Mining , Sand Loader Machine With 1.2m3 Bucket Capacity

    Ask Lasest Price
    Brand Name : MCLLROY
    Model Number : MCL940 ZL940
    Certification : CE,ISO9001
    Price : $ 4000-6000 /Unit
    Payment Terms : 30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
    Supply Ability : 100 sets / month
    Delivery Time : 5-8 working days
    • Product Details
    • Company Profile

    Industrial Wheel Loader Mining , Sand Loader Machine With 1.2m3 Bucket Capacity

    Industrial Construction Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened

    1. Products Description

    MCLLROY wheel loader is wildly used in construction, agriculture ,garden,etc. And we are experiencing in making high quality efficiency productivity.Strong power and chassis help to muddy road condition,flexible turning is suitable for small space ,excellent unloading height helpful for loading.

    For the axle of this loader, we use cast steel small axle housing. There are iron axle and Isuzu axle on the market. The axles play a key role in loader working and walking. Especially under severe working conditions, the internal forces of the axles is large. A good axle allows users to drive safely and work with confidence.


    2. Specification

    MCL 940
    Engine ModelYun Nei 4102 Supercharged
    RPM2400
    Rated Power76 kW
    EmissionsEU Stage II
    Operating Weight6100 kg
    Rated Load2800 kg
    Bucket Capacities1.2 m³
    Max. Travel Speed28 km/h
    Gear BoxCVT
    280 torque converter
    AlexLarge hub
    Axle Base2560 mm
    BrakeAir Brake
    Hydraulic Cycle time - lift≤ 6 s
    Min. Ground Clearance400 mm
    Wheel Base1640 mm
    Reach at Max.Dump Height3500 mm
    Dump Reach≤ 650 mm
    Overall Length - With Bucket6240 mm
    Overall Width2040 mm
    Overall Height2830 mm
    Tyre Size1670-24
    Breakout Force52 KN
    JoystickMachanical
    Min. turning radius≤ 6200 mm
    Hour meterYes
    Tool BoxYes
    Dual Hight&Low Speed HandleYes
    Air Conditioning/heaterOption
    Quick ChangeOption
    Multifunctional AttachmentOption
    Hydraulic PilotOption

    3. Details and Advantages

    The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

    1) Engine:Domestic famous engines ,green/turbocharged/inter-cooled engine.

    2) Transmission:Wet multi-plate clutch automatic transmission ,torque converter ,stable performance ,famous brand in China.

    3) Axle: Heavy-duty axle ,planetary reduction ,solid and durable ,with the corresponding tires ,for the loader to provide.

    4) Hydraulic system:Precision hydraulic cylinder and the fourth generation hydraulic transmission system give large breakout force for earth-moving work.


    4.Production lines:

    A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection

    Assembly:

    Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components.


    The second step is connecting engine and gearbox, then the third step must be putting them onto the frame.

    Put engine on the frame, connect the priority valve, install radiator and water tank;

    Add hydraulic transmission oil to the gearbox (add gear oil for mechanical transmission), install the hydraulic transmission oil radiator and pipeline, install the hydraulic oil radiator (the pipeline does not need to be connected), connect the brake caliper pipeline, brake pipeline, connect main reduction (differential) drive shaft.

    There are quite so many pipelines here, this step could use many screws and clamps.

    In this step, first of all, we must pay attention to the four feet of the frame where the engine is fixed, they have to be level, otherwise, the force is uneven, and there is a risk of cracking in the engine and gearbox housing; and the connection point of the radiator must be fixed with sealant; and then see if the clamp is tight; whether the screws of the transmission shaft are tightened.

    2-3 workers will be in charge of this step.






    Similar Model:

    Cat 903D/906M/907M/908M

    XCMG LW156/LW160/LW180/LW186/LW200

    Liugong 816C

    SDLG LG916 LG918 L918


    Quality Industrial Wheel Loader Mining , Sand Loader Machine With 1.2m3 Bucket Capacity for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Chanchiyo Holdings Group
    *Subject:
    *Message:
    Characters Remaining: (0/3000)