Sign In | Join Free | My burrillandco.com
Home > 2.5 Ton Wheel Loader >

Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box

Chanchiyo Holdings Group
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box from wholesalers
     
    Buy cheap Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box from wholesalers
    • Buy cheap Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box from wholesalers
    • Buy cheap Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box from wholesalers
    • Buy cheap Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box from wholesalers

    Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box

    Ask Lasest Price
    Brand Name : MCLLROY
    Model Number : MCL940 ZL940
    Certification : CE,ISO9001
    Price : $ 4000-6000 /Unit
    Payment Terms : 30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
    Supply Ability : 100 sets / month
    Delivery Time : 5-8 working days
    • Product Details
    • Company Profile

    Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box

    Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box

    1. Products Description

    MCLLROY wheel loader is wildly used in construction, agriculture ,garden,etc. And we are experiencing in making high quality efficiency productivity.Strong power and chassis help to muddy road condition,flexible turning is suitable for small space ,excellent unloading height helpful for loading.

    For the axle of this loader, we use cast steel small axle housing. There are iron axle and Isuzu axle on the market. The axles play a key role in loader working and walking. Especially under severe working conditions, the internal forces of the axles is large. A good axle allows users to drive safely and work with confidence.


    2. Specification

    MODELMCL 940
    ENGINEEngine ModelYun Nei 4102 Supercharged
    RPM2400
    Rated Power76 kW
    EmissionsEU Stage II
    WEIGHTSOperating Weight6100 kg
    Rated Load2800 kg
    BUCKETSBucket Capacities1.2 m³
    TRANSMISSIONMax. Travel Speed28 km/h
    Gear BoxCVT
    280 torque converter
    AlexLarge hub
    Axle Base2560 mm
    BrakeDisc Brake
    HYDRAULIC SYSTEMHydraulic Cycle time - lift≤ 6 s
    DIMENSIONS(APPROXIMATE)Min. Ground Clearance400 mm
    Wheel Base1640 mm
    Reach at Max.Dump Height3600 mm
    Dump Reach≤ 650 mm
    Overall Length - With Bucket6240 mm
    Overall Width2040 mm
    Overall Height2830 mm
    OPERATING SPECIFICATIONSTyre Size1670-24
    Breakout Force52 KN
    JoystickMachanical
    Min. turning radius≤ 6200 mm
    STANDARD EQUIPMENTHour meterYes
    Tool BoxYes
    Dual Hight&Low Speed HandleYes
    OPTIONAL EQUIPMENTAir Conditioning/heaterOption
    Quick ChangeOption
    Multifunctional AttachmentOption
    Hydraulic PilotOption

    3. Details and Advantages

    The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

    1) Frame:High Reliability Upgraded & enhanced front & back frames ,and reinforced counterweight.

    2) Cab:Comfortable Operation Ergonomic design for more comfortable operation.

    3) Convenient maintenance leading-out grease fitting is convenient for lubrication.

    4) Ladder with wide steps and well-placed hand holds to ease entry and exit from the cabin.


    4.Production lines:

    A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection


    Spray painting:

    Normally, the spray painting process includes hanging the parts, spraying primer or first layer coating, baking finish, spraying second layer coating, baking finish, drying in three different temperature.

    The workers in charge of hanging will check if the part has dust and oil, anything that will affect painting, which will be removed.

    There are two worker at Station 1 to do the painting on one side of the part.

    Another 2 workers at Station 2 will paint the other side, and the third worker will check if there is any spot missing and repaint.

    Next is our baking room and No. 1 to No. 3 drying machines.

    Pick up station workers use forklift to transfer the finished parts to the part's corresponding storage place, which is usually next to the production line.

    Some factories only hire one person to take care of the spray painting to cut the cost. It is hard to control the painting quality like that.

    Our technicians in the painting process are supposed to control the painting flow rate just right, without over painting, and the thickness of each surface should be balanced. In the pick up Station, there are special personnel for quality inspection of painted parts. Similarly, our factory adopts report mechanism. Subsequent assembly or factory inspection inspector find that the spray painting is unqualified and they will report it.





    Similar Model:

    Cat 903D/906M/907M/908M

    XCMG LW156/LW160/LW180/LW186/LW200

    Liugong 816C

    SDLG LG916 LG918 L918


    Quality Heavy Construction 2.5 Ton Wheel Loader CVT Gear Box for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Chanchiyo Holdings Group
    *Subject:
    *Message:
    Characters Remaining: (0/3000)