Sign In | Join Free | My burrillandco.com
Home > 2.5 Ton Wheel Loader >

Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option

Chanchiyo Holdings Group
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option from wholesalers
     
    Buy cheap Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option from wholesalers
    • Buy cheap Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option from wholesalers
    • Buy cheap Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option from wholesalers
    • Buy cheap Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option from wholesalers

    Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option

    Ask Lasest Price
    Brand Name : MCLLROY
    Model Number : MCL940 ZL940
    Certification : CE,ISO9001
    Price : $ 4000-6000 /Unit
    Payment Terms : 30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
    Supply Ability : 100 sets / month
    Delivery Time : 5-8 working days
    • Product Details
    • Company Profile

    Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option

    Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option

    1. Products Description

    we need the construction machine to do heavy work, obviously it has to be efficient, take loader as an example, the bucket should shovel as much as possible, the loader should be stable while working, the control should be flexible and easy, the malfunction rate is low of course.


    MCLLROY wheel Loader is a kind of front wheel loader with single bucket ,articulated and hydraulic unloading. It has been developed and designed in accordance with user requirements, reference models after absorption of domestic and overseas advanced similar structural features and advanced technology.


    2. Specification

    MODELMCL 940
    ENGINEEngine ModelYun Nei 4102 Supercharged
    RPM2400
    Rated Power76 kW
    EmissionsEU Stage II
    WEIGHTSOperating Weight6100 kg
    Rated Load2800 kg
    BUCKETSBucket Capacities1.2 m³
    TRANSMISSIONMax. Travel Speed28 km/h
    Gear BoxCVT
    280 torque converter
    AlexLarge hub
    Axle Base2560 mm
    BrakeDisc Brake
    HYDRAULIC SYSTEMHydraulic Cycle time - lift≤ 6 s
    DIMENSIONS(APPROXIMATE)Min. Ground Clearance400 mm
    Wheel Base1640 mm
    Reach at Max.Dump Height3600 mm
    Dump Reach≤ 650 mm
    Overall Length - With Bucket6240 mm
    Overall Width2040 mm
    Overall Height2830 mm
    OPERATING SPECIFICATIONSTyre Size1670-24
    Breakout Force52 KN
    JoystickMachanical
    Min. turning radius≤ 6200 mm
    STANDARD EQUIPMENTHour meterYes
    Tool BoxYes
    Dual Hight&Low Speed HandleYes
    OPTIONAL EQUIPMENTAir Conditioning/heaterOption
    Quick ChangeOption
    Multifunctional AttachmentOption
    Hydraulic PilotOption

    3. Details and Advantages

    The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

    1) Engine:Domestic famous engines ,green/turbocharged/inter-cooled engine.

    2) Transmission:Wet multi-plate clutch automatic transmission ,torque converter ,stable performance ,famous brand in China.

    3) Axle: Heavy-duty axle ,planetary reduction ,solid and durable ,with the corresponding tires ,for the loader to provide.

    4) Hydraulic system:Precision hydraulic cylinder and the fourth generation hydraulic transmission system give large breakout force for earth-moving work.


    4.Production lines:

    A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection

    Assembly:

    Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components.

    First, our workers will assemble the front frame, rear frame, swing frame, front axle, rear axle together, and then install air tank, relief valve, air booster pump on the frame.

    At this step, the worker should pay attention to the tightness of the screws and adjust the gap: for example, the hinged part is not supposed to move up and down and must be tight (can be shaken left and right); there is also a gap between the swing frame and rear frame, which can be moved up and down, but not back and forth; and Gear oil should be added to the front and rear axles.




    Similar Model:

    Cat 903D/906M/907M/908M

    XCMG LW156/LW160/LW180/LW186/LW200

    Liugong 816C

    SDLG LG916 LG918 L918


    Quality Construction Engineering 2.5 Ton Wheel Loader Hydraulic Pilot Option for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Chanchiyo Holdings Group
    *Subject:
    *Message:
    Characters Remaining: (0/3000)